WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SELECT t.*, tt.*, tr.object_id FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON t.term_id = tt.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('category', 'post_tag', 'post_format') AND tr.object_id IN (682) ORDER BY t.name ASC

CAPTure presents at SolarPaces 2016 | Capture

CAPTure presents at SolarPaces 2016

p1020475

The CAPTure consortium attended the 2016 edition of the SolarPaces Conference on 11-14 October in Abu Dhabi, UAE.

The event had over 470 participants from 37 countries around the globe.

CAPTure partner EDF delivered an oral presentation covering the  “Evolution of Solar Plants Valorization in Energy-only Electricity Markets with High Renewable Share”, in which case studies in Spain were presented.

Furthermore, IK4 Tekniker presented a poster on “Modeling and simulation of fixed bed regenerators”.

 

poster_ivan

The CAPTure project intends to increase plant efficiencies and reduce levelised cost of electricity (LCOE) by developing all relevant components that allow implementing an innovative plant configuration. This plant configuration is based on a multi-tower decoupled advanced solar combined cycle approach that not only increases cycle efficiencies but also avoids frequent transients and inefficient partial loads, thus maximizing overall efficiency, reliability as well as dispatchability, all of which are important factors directly related to cost competitiveness on the power market.

For further information please click here or contact info@capture-solar-energy.eu.